BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//TRTR - ECPv6.10.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:TRTR
X-ORIGINAL-URL:https://www.trtr.org
X-WR-CALDESC:Events for TRTR
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20260308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20261101T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20260805T093000
DTEND;TZID=America/New_York:20260805T110000
DTSTAMP:20260913T104746
CREATED:20260722T211609Z
LAST-MODIFIED:20260913T061626Z
UID:6081-1785922200-1785927600@www.trtr.org
SUMMARY:Risk-Informing 10 CFR 50.59 and Allowing Flexibility for Changes to Methods
DESCRIPTION:There are two proposed changes to 10 CFR 50.59\, “Changes\, tests\, and experiments.” The first proposed change to the regulation would allow the use of quantitative risk results to demonstrate a change to the facility does not result in a “more than minimal increase” as the phrase is used in 10 CFR 50.59(c)(2)(i) and (ii). The second proposed change would allow licensees to make changes to methods that would previously have required NRC review under 10 CFR 50.59(c)(2)(viii) or 53.1550(a)(2)(iv)\, provided the licensee adopts an acceptable verification\, validation\, and uncertainty quantification (VVUQ) program in accordance with a proposed new 10 CFR 50.221\, “Credibility requirements for modeling and simulation.” This shift would enable licensee-led evaluations and allow for the evaluation of advanced modeling methods through structured processes rather than fixed requirements.
URL:https://www.trtr.org/event/risk-informing-10-cfr-50-59-and-allowing-flexibility-for-changes-to-methods/
LOCATION:Washington DC\, DC\, United States
END:VEVENT
END:VCALENDAR